Product Development · · 5 min read

From CAD to Production: Approval Gates That Reduce Rework

How to turn design feedback into a versioned, production-ready approval trail.

Custom jewelry render used to discuss design approval stages

Custom development becomes easier to control when every stage has a named output and a clear approval owner. Informal chat references should support the record, not replace it.

Freeze the brief before geometry

Confirm the market, style, material route, stone assumptions, target cost, quantity and deadline. Open questions should be visible before CAD work begins.

Approve a named CAD version

Review top, side and wearing views together with key measurements, stone map and construction notes. Record the exact version that is approved for prototype or sample.

Use the physical sample as a commercial checkpoint

Check fit, appearance, finish, stone security, branding and packaging direction. Changes after sample approval can affect tooling, material, time and price.

This guide is general procurement information. Project-specific materials, reports, tolerances, MOQ, lead time, payment and delivery terms are confirmed only in the written quotation and approved specification.